<< Back to Website

KPL Construction Progress, December 23, 2011

  • Lama Atillio Marconi and Karma Tsondru finishing up a handicap ramp designed by Atillio
  • Bardor Tulku Rinpoche and Sonam Chotso on the new handicap ramp
  • Lama Atillio Marconi on the finished handicap ramp of his design
  • Dan Curtis and Atillio Marconi building an acess driveway for the handicap ramp
  • Dan Curtis building an acess driveway for the handicap ramp
  • Fancing off the access driveway for the handicap ramp (Dan Curtis on the left and Bardor Tulku Rinpoche on the right)
  • Sprinkler watr tank and the piping have been covered up
  • New path from the new building to the house at 37 Pinewood Lane.
  • New stairs in the new building