<< Back to Website
KPL Construction Progress, December 23, 2011
Lama Atillio Marconi and Karma Tsondru finishing up a handicap ramp designed by Atillio
Bardor Tulku Rinpoche and Sonam Chotso on the new handicap ramp
Lama Atillio Marconi on the finished handicap ramp of his design
Dan Curtis and Atillio Marconi building an acess driveway for the handicap ramp
Dan Curtis building an acess driveway for the handicap ramp
Fancing off the access driveway for the handicap ramp (Dan Curtis on the left and Bardor Tulku Rinpoche on the right)
Sprinkler watr tank and the piping have been covered up
New path from the new building to the house at 37 Pinewood Lane.
New stairs in the new building
This
jQuery slider
was created with the free
EasyRotator
software from DWUser.com.
Need a powerful
Flash slideshow
creator with built-in iPhone/iPad/Android support? EasyRotator is supported by the
XML Flash Slideshow v4 Software
.
OK
Rotator powered by
EasyRotator
, a free and easy
jQuery slider
builder from DWUser.com. Please enable JavaScript to view.